Sports Equipment / Products

Basketball Master Multi-Screen Game

A real basketball hoop paired with a projected game: four levels, multi-screen team play, live scoring and a leaderboard that ranks every player against past results.

  • Free site planning and equipment list
  • Engineers on site for installation, commissioning and training
  • One-year free warranty with continuous gameplay updates
Basketball Master Multi-Screen Game

Product photo · final delivered configuration prevails

HOW WE WORK

If we are not a fit, we will say so

Give us the city, floor area and budget. We judge whether the project model holds before we talk about equipment.

Get a custom plan
  • First reply within one working day
  • We will tell you straight if it does not fit
  • See the proposal and pricing before you commit

Who actually decides a venue project

Projects are approved by several roles, not one buyer. We prepare the material each role needs instead of one generic pitch.

  • 01

    Owner / investor

    Needs site conditions, investment structure and opening date to make sense together, not a unit price.

  • 02

    Operations lead

    Needs staffing, training, maintenance and content updates covered before opening.

  • 03

    Design / fit-out partner

    Needs floor area, circulation, power and fire-safety conditions translated into drawings.

WHERE IT BREAKS

Where venue projects actually stall

Pick the situation closest to yours. We answer it directly instead of sending a catalogue first.

Choose the closest one

WHAT THE BUDGET BUYS

What the budget actually buys

Give us floor area and a budget tier, and we return an indicative investment structure with the equipment mix that fits it.

A starting split for early planning. It is not a quotation.

Indicative split

DEMO · 300 m²
  • Equipment55%
  • Fit-out and environment25%
  • Launch and operations12%
  • Contingency8%

Suggested equipment mixSports Equipment / Amusement Equipment / AR / VR

Shares are indicative. Final configuration and pricing are confirmed after on-site measurement and a written proposal.

Planning assumption only. No return-on-investment or revenue forecast is implied.

Turn this into a written proposal

All information you provide is kept strictly confidential.

Spec visualiser

See the numbers in space

Dimensions, power and site conditions come straight from the manufacturer spec sheet. Bring your own floor size and test the layout below.

Typical venuesSports hallFamily entertainmentShooting zone

Footprint is calculated from cabinet width × depth; all other figures come from the manufacturer spec sheet.

Drawn to scale

Gap ≥ 0.6 m7 m4 m2 m

7 {unit} × 4 {unit} × 3 m high, 28 sqm. Dashed frame shows the 0.6 m service gap. Dimensions from the manufacturer spec sheet.

How many fit in your floor

12 m8 m
1Units
29%Floor use
28 ㎡Equipment area
1.2 kWTotal power

For 1 units running together, reserve a 3-phase 380V 3A or 1-phase 220V 7A circuit (15% headroom included).

Unit rated voltage: 220V.Final wiring to be confirmed by an on-site electrician.

Arranged 1 × 1; fire aisle and service gap included, columns, doors and service access excluded.

More units on the same floor

Estimated with the same floor, gap and headroom; only layout capacity is compared. Gameplay, pricing and operations are separate.

Get a quote for this layoutHand the floor size and unit count above to an advisor; final configuration is confirmed after a site survey.

How it compares

Dashed marker = average of the 13 units (26.73 ㎡); this unit ranks 6 of 13; it is 5% above it

All figures come from each unit’s manufacturer spec sheet; dimensions are the cabinet outline, excluding audience and service clearance.

Six-axis profile

Footprint: 28 ㎡Power: 1.2 kWHeight: 3 mModes: 4FootprintPowerHeightModes
Further out = larger value
Dashed = average of other units
13 units in group; normalised within the group

PRODUCT DOCUMENTS

Gameplay and installation manuals for this model

Download the original manuals for gameplay rules, venue layout and equipment setup, for internal evaluation and on-site coordination.

The original manuals are published in Chinese. Contact us if you need key sections explained in English.

  • Digital Sports

    Basketball Master · Gameplay & Installation Guide

    Gameplay rules, venue layout and equipment installation notes for project planning and on-site setup.

    21 pages · 2.2 MB · Chinese edition

QUALIFICATION

Certifications and test reports for this model

Documents archived for this product. The numbers shown can be checked against the originals; stamped copies are supplied by model for tenders and venue approvals.

See the company certification system
  • Software copyrights
    Software copyrights2024SR0051212
  • Third-party test reports
    Third-party test reportsWT23060828

PURCHASE / PROCUREMENT AND DELIVERY

Where this unit fits — and what you receive

A single machine only keeps running inside a fitting venue model. Below are the typical placements for this equipment and what every delivery includes.

Typical placements

  • Indoor sports venues and sports parks: used as a headline or overflow unit, run together with ticketing and membership.
  • Shopping malls and family entertainment centres: captures dwell time from family and passing footfall.
  • Tourism and study-tour sites: an indoor experience point that combines into a route with outdoor activities.

What a delivery includes

  • Equipment, control system and software, with full unit testing before shipment.
  • On-site installation, commissioning and staff training: engineers complete installation, trial runs and operator training on site.
  • One-year free warranty, spare parts in stock, remote diagnostics and on-site service when needed.

Questions before ordering

How is the quotation set?
We start with an on-site measurement, then issue an equipment list and investment model based on area, ceiling height, load capacity and visitor flow — not a standard price list detached from the site.
How is the schedule planned?
It is built backwards from the opening date; equipment production, environment design and site construction run in parallel, with key milestones confirmed item by item in the project plan.
What happens if the equipment fails?
The factory covers it during the one-year free warranty; spare parts are kept in stock, we start with remote diagnostics and send engineers on site when needed.

DETAIL / PRODUCT DETAILS

Basketball Master combines a real hoop with a software scene, so the shot is physical and the scoring is automatic. Several screens can run one session together, which turns a row of hoops into a single team challenge.

Four levels

  • Level 1: every basket scores a fixed value and the team has to reach the target total before time runs out.
  • Level 2: timing matters — a number in the centre of the screen changes continuously, and a basket scores whatever that number shows at the moment of the shot.
  • Level 3: each player has a pool of water that drains throughout the level; only baskets refill it, and the team fails if any pool runs dry before the total is reached.
  • Level 4: a virtual ball jumps between four scoring lines behind it, so each basket scores according to the line the ball is on when the shot goes in.

Scoring and leaderboard

After every level the system reports each player’s contribution. If the run ends early or the team clears all four levels, the full per-level record is kept, and the final total is ranked against other players’ results to drive repeat attempts.

Where it fits

The unit works as a single station or as a multi-screen team game, which suits sports halls, family entertainment centres and event floors where groups want to compete together rather than one at a time.

Session and care

Staff set the level and the team size before the first shot, and the same screen carries the briefing, the scoreboard and the final ranking. Check the hoop, the backboard, the ball stock and the projection alignment as part of the daily opening routine.

Pairing and events

Basketball Master plays as a team game, so it pairs naturally with a head-to-head basketball unit: one floor can offer individual competition and team co-operation without duplicating equipment. For a group booking, staff link the screens into one session, set the team size and start from level 1, letting the four levels raise the pressure as the run continues — timing on level 2, the draining water pools on level 3 and the moving scoring lines on level 4. The machine can be set to coin or free play, so a venue can switch between walk-up play on a normal day and a free-play bracket during an event.

Whole-venue references

How this equipment fits a full venue

Projects below were delivered by SPORTS ANT as whole venues; equipment mix is reconfigured per site. Tagged items indicate delivered evidence of this equipment.

All cases

Keep exploring

From one machine to a whole venue

VERIFIABLE FACTS

Facts you can check

Certifications, delivery stages, warranty and after-sales, and project sites you can visit.

WHEN NOT TO BUY

NEXT STEP

Take one small step

Choose how far you want to go today. Every tier ends with a person, not an automated funnel.

01

Download the planning kit

Low commitment: take the checklist and read it on your own time.

Send the kit
02

Book a 30-minute review

Medium commitment: a structured call on your site, budget and opening date.

Book the review
03

Request a written proposal

Full commitment: configuration, pricing and schedule against your actual site.

Request the proposal
04

Visit a live project

Confirm layout, circulation, operation and maintenance on a running site, not from photos.

Arrange the visit
05

Prototype before rolling out

Build a prototype of the key equipment and workstation against the confirmed proposal; scope, lead time and cost are agreed in writing.

Discuss the prototype

Customer Kit

REGISTER TO DOWNLOAD

The full project kit, one registration

Attachments: 8 QFZ enterprise standards, 2 test reports, 1 patent certificate, 2 software copyrights and the 2024.7 brand book, plus an English Executive Summary.

Download the kit (ZIP, 29 PDFs)We ask for your name, company and one contact method. The link stays valid for 7 days and allows up to 10 downloads.

Equipment usually configured together

All products
Back to products

We use cookies to improve your browsing experience and analyze site traffic. By continuing to browse, you agree to our Cookie Policy.